CHAPTER 5 - FUSELAGE SIDES
![]() |
![]() |
||
|
I separated the jigs and hot glued them to the table for the foam attachment. Note the longerons face out for access and clamping room. |
A fuel cell finish nailer, instead of 5 min. epoxy, was used to affix the foam to the masonite. The sides held tight and after glassing pulled off from the jig like a Velcro zipper, leaving only pin sized holes. | ||
![]() |
![]() |
|
| The sides, upper and lower longerons glassed. |
The electrical conduit and LWY and LWX pieces. |
![]() |
||
|
LWY and LWX with foam infill. |